To calculate the 3D Print Time (T):
T=(WB)×(DS)×(HS)
Where:
A 3D Print time is defined as the total time it takes for a 3D print to complete a job, not including cooling time. The time it takes is dependent on the part size, part resolution, and build speed.
Let's assume the following values:
Using the formula:
T=(10050)×(500.4)×(1000.4)=2×125×250=62500 minutes
The total 3D print time is 62500 minutes.
Let's assume the following values:
Using the formula:
T=(200100)×(1000.5)×(2000.5)=2×200×400=160000 minutes
The total 3D print time is 160000 minutes.