The formula to calculate the concrete cost is:
\[ CC = WCC \times CPP \]
Where:
The concrete cost is the total amount of money required to purchase the concrete needed for a project. This cost is determined by multiplying the total weight of concrete needed by the cost per pound of concrete.
Let's assume the following values:
Step 1: Multiply the total weight of concrete needed by the cost per pound:
\[ CC = 2000 \times 0.05 = 100 \]
The Concrete Cost (CC) is $100.